CHAIRMAN OF THE AD HOC COMMITTEE ON A NUCLEAR TEST BAN CD/NTB/WP.321 21 March 1996
Working Paper
Outline of a draft Comprehensive Nuclear Test-Ban Treaty
TABLE OF CONTENTS
A.VERIFICATIONDURATION AND WITHDRAWALPROTOCOL TO THE COMPREHENSIVE NUCLEAR TEST-BAN TREATY
ANNEX TO THE PROTOCOL
© 1996 The Acronym Institute.
PREAMBLE | |
ARTICLE I | BASIC OBLIGATIONS |
ARTICLE II | THE ORGANISATION |
A.GENERAL PROVISIONS | |
B.THE CONFERENCE OF THE STATES PARTIES | |
C.THE EXECUTIVE COUNCIL | |
D.THE TECHNICAL SECRETARIAT | |
E.PRIVILEGES AND IMMUNITIES | |
ARTICLE III | NATIONAL IMPLEMENTATION MEASURES |
ARTICLE IV | |
B.GENERAL PROVISIONS | |
C.THE INTERNATIONAL MONITORING SYSTEM | |
D.CONSULTATION AND CLARIFICATION | |
E.ON-SITE INSPECTIONS | |
F.ASSOCIATED CONFIDENCE BUILDING/TRANSPARENCY MEASURES | |
ARTICLE V | MEASURES TO REDRESS A SITUATION AND TO ENSURE COMPLIANCE, INCLUDING SANCTIONS |
ARTICLE V1 | SETTLEMENT OF DISPUTES |
ARTICLE VII | AMENDMENTS |
ARTICLE VIII | REVIEW OF THE TREATY |
ARTICLE IX | |
ARTICLE X | STATUS OF THE PROTOCOL |
ARTICLE XI | SIGNATURE |
ARTICLE XII | RATIFICATION |
ARTICLE XIII | ACCESSION |
ARTICLE XIV | ENTRY INTO FORCE |
ARTICLE XV | RESERVATIONS |
ARTICLE XVI | DEPOSITARY |
ARTICLE XVII | AUTHENTIC TEXTS |
[PEACEFUL USE OF NUCLEAR ENERGY] | |
[PEACEFUL NUCLEAR EXPLOSION] | |
[SECURITY ASSURANCES FOR STATE PARTIES] | |
[RELATION TO OTHER INTERNATIONAL AGREEMENTS] | |
[ANNEX | LISTS OF STATES] |
PART I: | THE INTERNATIONAL MONITORING SYSTEM |
A.GENERAL PROVISIONS | |
B.SEISMOLOGICAL MONITORING | |
C.RADIONUCLIDE MONITORING | |
D.HYDROACOUSTIC MONITORING | |
E.INFRASOUND MONITORING | |
F.INTERNATIONAL DATA CENTRE FUNCTIONS | |
H.USE OF SATELLITE DATA AND OTHER METHODS | |
PART II: | ON-SITE INSPECTIONS |
A.GENERAL PROVISIONS | |
B. STANDING ARRANGEMENTS | |
C. PROCEDURES FOR REQUESTING AN INSPECTION | |
D. PRE-INSPECTION ACTIVITIES | |
E. CONDUCT OF INSPECTIONS | |
PART III: | ASSOCIATED/CONFIDENCE-BUILDING |
[IMS Part 5: | Satellite Monitoring] |
[IMS Part 6: | Electromagnetic Pulse Monitoring] |
Table 1-A | Seismological Stations Comprising the Primary Network |
Table 1-B | Seismological Stations Comprising the Auxiliary Network |
Table 2-A | Radionuclide Stations Incorporated into the International Monitoring System |
[Table 2-B | Radionuclide Laboratories] |
[Table 2-C | Flying Laboratories Incorporated into the International Monitoring System] |
Table 3 | Hydroacoustic Stations Incorporated into the International Monitoring System |
Table 4 | Infrasound Stations Incorporated into the International Monitoring System |
[APPENDIX | Characterisation Parameters for International Data Centre Standard Event Screening] |